20121221


platform 0.3 under construction
nrw/germany  2012


platform 0.3 under construction, nrw 12/ 2012


platform 0.3/ 0.2, old and new staircase, autumn 2012

floating new structure, summer 2012








via arboreum
mucho mas mayo, Cartagena 2012

via arboreum, 60cm distance-structure, mmm cartagena 2010



via arboreum, mmm cartagena 2010



via arboreum, muchomasmayo cartagena 2010







platform 0.2
nrw, germany 2007



                                                                                                                                platform 0.2, NRW, Germany 2007



Since 2005  platform continues  in process of transformation.  The tree-tecture is thought  as transformable sculptural compound, in which human construction and intervention upon natural existence and the host tree itself end up in an harmonic co-exsistence. The anarchitectual  construction provides a refuge platform, a place with a joyous sense of out of reach within a natural surrounding.







panorama shed
the dreamshelter project, + josee dubeau, quebec 2005

panorama shed, dreamshelter project, quebec 2005



 dreamshelter project, roof transport, st. jean port jolie, 2005

panoramashed, under construction, quebec 2005


saint lawrence bay at  low tide, panorama shed, quebec  2005








lab
ideas & projects

design for pasarelle to panorama-tower, mmm Cartagena 2010







platform 0.3 - winter 2012


platform 0.3in parenthesis, december 2012
The platform is an entirely suspended construction. Its´ shape follows the structure of the tree, distributing the charge in between and around three mayor ramification of the oak tree.  Living wood is multiple times more resistant than cut plywood, so it is highly important to avoid deterioration of the plant, which could result from the oxidation of nails in a living trunk. Not a single nail is carved into the wood, so the construction can float and grow with the tree. 
Platform 0.1 was build with unprotected wood, which under the german climate condition has a limited live-expectation. In 2012  the platform is reconstructed using treated plywood to guarantee a large durability under the open exposure to the elements. 


suspended platform 0.3  in the snow, december  2012

After the first strong snowfalls in mid december the continuation of the work has to wait until early spring 2013. 


winter platform 0.3, 2012

platform 0.3, under construction

working platform, winter 2012


platform 0.3, under construction

platform 0.3, under construction - winter 2012

stairs-structure platform 0.3 - winter 2012

platform 0.3 under construction - 2012



platform 0.3  in process - 2012

working platform 0.3 -  2012

panorama+lifter, platform 0.3 - 2012
platform 0.3 under construction - 2012

structure-up,  platform 0.3  - 2012